End of season 2023
And another year comes to an end. This season was a complete success compared to last year. Many new volunteers have signed up and the...
Apr 5, 2023
Track "Nonnewisen"
Repair of the automatic level crossing As some visitors may have noticed, on the way to the "Nonnewisen" station there is a level...
Oct 16, 2022
Main line
Ballasting the main line The first step in getting the main line operational again is to ballast the tracks behind the tennis courts....
Sep 8, 2022
Steam locomotive 352
Current progress of the maintenance work Even if not much has changed at first glance, we are still working hard. At the moment all brass...
Sep 8, 2022
Light signals
Changing the lightbulbs of the signals Until now, light signals were equipped with standard bulbs. Now they have been replaced by LEDs....
Aug 25, 2022
Track "Nonnewisen"
Night shift at CF Lankelz At the entrance to the "Nonnewisen" train station, one of our drivers noticed major bumps in the rails last...
Aug 1, 2022
Lighting passing loop
Completing the electrical work on the passing loop First, new circuit boards for the route display were manufactured. These were then...