Oct 18, 2023End of season 2023And another year comes to an end. This season was a complete success compared to last year. Many new volunteers have signed up and the...
Apr 5, 2023Track "Nonnewisen"Repair of the automatic level crossing As some visitors may have noticed, on the way to the "Nonnewisen" station there is a level...
Oct 16, 2022Main lineBallasting the main line The first step in getting the main line operational again is to ballast the tracks behind the tennis courts....
Sep 8, 2022Steam locomotive 352Current progress of the maintenance work Even if not much has changed at first glance, we are still working hard. At the moment all brass...
Sep 8, 2022Light signalsChanging the lightbulbs of the signals Until now, light signals were equipped with standard bulbs. Now they have been replaced by LEDs....
Aug 25, 2022Track "Nonnewisen"Night shift at CF Lankelz At the entrance to the "Nonnewisen" train station, one of our drivers noticed major bumps in the rails last...
Aug 1, 2022Lighting passing loopCompleting the electrical work on the passing loop First, new circuit boards for the route display were manufactured. These were then...