top of page
Apr 28, 2024
Season start in 2024
It's that time again. On May 1st, 2024 you can join us again from 2:00 p.m. onwards. This year with the entire route and steam.
Jan 8, 2024
Steam locomotive 352 as of 08/01/2024
Current progress of the maintenance work After a long break, here's the great news: The steam locomotive is about to be put back into...
Oct 18, 2023
End of season 2023
And another year comes to an end. This season was a complete success compared to last year. Many new volunteers have signed up and the...
Apr 5, 2023
Track "Nonnewisen"
Repair of the automatic level crossing As some visitors may have noticed, on the way to the "Nonnewisen" station there is a level...
Jan 30, 2023
Main line
News about the section next to the bike path As some visitors may remember, only half the route was used during the last season. This was...
Jan 30, 2023
Steam locomotive 352 as of 02/30/2023
Current progress of the maintenance work Also in the new year we continue to work diligently on the locomotive. As can be seen in the...
Dec 20, 2022
Merry Christmas
The CF Lankelz team wishes everyone a Merry Christmas and a Happy New Year.
Oct 16, 2022
Main line
Ballasting the main line The first step in getting the main line operational again is to ballast the tracks behind the tennis courts....
Oct 9, 2022
End of the season
The driving season is now over. The whole squad thanks you for your visit and hopes to welcome you again on May 1, 2023. Maintenance work...
Sep 8, 2022
Steam locomotive 352
Current progress of the maintenance work Even if not much has changed at first glance, we are still working hard. At the moment all brass...
Sep 8, 2022
Light signals
Changing the lightbulbs of the signals Until now, light signals were equipped with standard bulbs. Now they have been replaced by LEDs....
Aug 25, 2022
Track "Nonnewisen"
Night shift at CF Lankelz At the entrance to the "Nonnewisen" train station, one of our drivers noticed major bumps in the rails last...
Aug 25, 2022
Diesel 501
Repair after technical failure on 08/21/2022 On August 21, 2022, a technical failure occurred during normal operation. Locomotive 501's...
Aug 1, 2022
Lighting passing loop
Completing the electrical work on the passing loop First, new circuit boards for the route display were manufactured. These were then...
Jul 15, 2022
Steam locomotive 352
Current progress of the maintenance work After the boiler has been in Switzerland for almost half a year due to maintenance work, it is...
bottom of page